ILLINOIS POLLUTION CONTROL BOARD
October 17, 2002
CITY OF BENTON,
Petitioner,
v.
ILLINOIS ENVIRONMENTAL
PROTECTION AGENCY,
Respondent.
)
)
)
)
)
)
)
)
)
)
PCB 03-47
(Provisional Variance – Water)
ORDER OF THE BOARD (by C.A. Manning):
On October 15, 2002, the Illinois Environmental Protection Agency (Agency)
recommended that the Board grant a 45-day provisional variance to the City of Benton (City)
beginning on October 14, 2002. The City is requesting a provisional variance from the monthly
average chlorine residual, total suspended solids (TSS), and carbonaceous biochemical oxygen
demand (CBOD) effluent limits in its National Pollutant Discharge Elimination System
(NPDES) permit, and 35 Ill. Adm. Code 304.120(b) and 304.141(a). The provisional variance
would allow the City to repair its trickling filter at its wastewater treatment plant in Benton,
Franklin County. The Agency states that failure to grant the provisional variance would impose
an arbitrary or unreasonable hardship on the City.
Section 35(b) of the Environmental Protection Act (415 ILCS 5/35(b) (2000)) provides:
The Board shall grant provisional variances, only upon notification from the
Agency that compliance on a short term basis with any rule or regulation,
requirement or order of the Board, or with any permit requirement would impose
an arbitrary or unreasonable hardship. Such provisional variances shall be issued
within 2 working days of notification from the Agency. 415 ILCS 5/35(b) (2000);
see also
35 Ill. Adm. Code 104.302.
A provisional variance lasts for no more than 45 days, but the Board can extend the time period
up to an additional 45 days on the Agency’s recommendation. Provisional variances granted to
one person cannot exceed a total of 90 days during any calendar year. 415 ILCS 5/36(c) (2000);
35 Ill. Adm. Code 104.308.
The Board grants the City a provisional variance from its NPDES permit and 35 Ill. Adm.
Code 304.120(b) and 304.141(a), subject to the following conditions:
1. This provisional variance shall begin on October 14, 2002, and continue for 45
days from that date or until completion of the project, whichever occurs earlier.
2
2. During the variance period, the City shall meet the monthly average effluent
concentration limits of 0.75 for chlorine residual, 40 mg/l for CBOD and 50 mg/l
for TSS. The City shall continue to monitor and maintain compliance with all
other parameters and conditions specified in NPDES permit number IL0022365.
3. The City shall complete the construction work on its trickling filter as
expeditiously as possible. During the provisional variance period, the City shall
operate the facility in such a manner so as to produce the best effluent practicable.
4. The City shall notify Barb Conner of the Agency by telephone at 217/782-9720
when repairs on the wastewater treatment system are completed. Written
confirmation shall be sent within five days to the following address:
Illinois Environmental Protection Agency
Bureau of Water, Compliance Assurance Section
Attention: Barb Conner
1021 North Grand Avenue East
P.O. Box 19276
Springfield, Illinois 62794-9276
IT IS SO ORDERED.
If the City chooses to accept this provisional variance, it must execute a Certificate of
Acceptance of all terms and conditions of this provisional variance and, within 10 days after the
date of the above order, forward the executed certificate to the Agency at the above address. The
form of the certificate is as follows:
CERTIFICATE OF ACCEPTANCE
The City of Benton accepts and agrees to be bound by all terms and
conditions of the Pollution Control Board’s October 17, 2002 order in PCB 03-47.
______________________________________
Petitioner
______________________________________
Authorized Agent
______________________________________
Title
______________________________________
Date
Section 41(a) of the Environmental Protection Act provides that final Board orders may
be appealed directly to the Illinois Appellate Court within 35 days after the Board serves the
order. 415 ILCS 5/41(a) (2000);
see also
35 Ill. Adm. Code 101.300(d)(2), 101.906, 102.706.
Illinois Supreme Court Rule 335 establishes filing requirements that apply when the Illinois
Appellate Court, by statute, directly reviews administrative orders. 172 Ill. 2d R. 335. The
3
Board’s procedural rules provide that motions for the Board to reconsider or modify its final
orders may be filed with the Board within 35 days after the order is received. 35 Ill. Adm. Code
101.520;
see also
35 Ill. Adm. Code 101.902, 102.700, 102.702.
I, Dorothy M. Gunn, Clerk of the Illinois Pollution Control Board, certify that the Board
adopted the above order on October 17, 2002, by a vote of 6-0.
Dorothy M. Gunn, Clerk
Illinois Pollution Control Board