R 85-007 Opinion and Order 09/11/86
IN THE MATTER OF: SITE SPECIFIC RULEMAKING FOR CENTRAL ILLINOIS LIGHT COMPANY.
Handle: Document-27134
Owner: Site Administrator (User-2, admin:DocuShare)DS
Wednesday, July 31, 2002 04:23:08 PM CDT
Thursday, August 26, 2004 10:36:04 AM CDT
Modified By:
Locked By:
  • ILLINOIS POLLUTION CONTROL BOARD
September 11, 1986IN THE MATTER OF: ) SITE—SPECIFIC RULEMAKING ) R85—7FOR CENTRAL ILLINOIS LIGHT ) COMPANY.
  • However, on
January 21, 1986, the Agency filed a recommendation that CILCO’spetition be denied.
  • 72-369
—2—For the reason discussed below, the Board declines to grantthe regulatory change requested by CILCO.
  • The station has three coal—fired electric
generating units (1, 2, & 3) with respective net capacities of117 megawatts (“MW”), 266 MW, and 361 MW.
  • Excess water from the
pond is drawn off as an effluent at a standpipe structure locatedon the ea...
Allowed
SykutaJ
Adobe Portable Document Format (.pdf) - application/pdf
R 85-007 Opinion and Order 09_11_86.pdf
4
785765
No
Appears In: R 85-007
Preferred Version: R 85-007 Opinion and Order 09/11/86