October 10, 1991GEORGE WEBER CHEVROLET ) FACILITY, ) Petitioner,v.
) PCB 91—182
) (Underground Storage Tank FundReimbursement Determination)ILLINOIS ENVIRONMENTALPROTECTION AGENCY,Respondent.
This filing, made some
eight months after the Agency decision, is well outside the 35 dayappeal period prescribed by Section 28.l8b of the Act.
2—90-1432 (2d Dist.
slip op.
IT IS SO ORDERED.
I, Dorothy M. Gunn, Clerk of the Illinois Pollution ControlBoard, hereby certify,~th~theabove Order was adopted on the/E1’~ day of ~ , 1991 by a vote of7-c. ...