  • ILLINOIS POLLUTION CONTROL BOARD
December 6, 1991MARSCO NFG.
  • Adm.
  • Code 104.121(e);
2.
  • A detailed description of the existing and proposed
equipment or proposed method of control to beundertaken to achieve full compliance with the Act andregulations, including a time schedule for theimplementation of all phases of the control programfrom initiation of design to program completion and theestimated costs involved for each phase and the totalcost to achieve compliance, as required by 35 Ill.
  • Second, Marsco has not submitted a compliance plan.
  • Marsco has failed to provide a statement of consistency with
Federal law as required by Section 104.122 or a hearing requestor wai...