View Properties

R 92-017 09/23/93 Opinion and Order
IN THE MATTER OF: PETITION OF THE U.S. ARMY ENGINEER DISTRICT, ROCK ISLAND, FOR A DREDGED MATERIAL PLACEMENT REGULATION APPLICABLE TO THE ILLINOIS RIVER / WATERWAY BETWEEN LA GRANGE LOCK AND DAM (MILE 80.2) AND LOCKPORT LOCK (MILE 291): 35 ILL. ADM. CODE 303.400
Handle: Document-20443
Owner: Site Administrator (User-2, admin:DocuShare)DS
Wednesday, May 1, 2002 03:57:30 PM CDT
Friday, October 15, 2004 04:42:53 PM CDT
Modified By: Site Administrator (User-2, admin:DocuShare)DS
Locked By:
  • ILLINOIS POLLUTION CONTROL BOARD
September 23, 1993IN THE MATTER OF:PETITION OF THE U.S.
  • ARMY ENGINEER ) R92-17
DISTRICT, ROCK ISLAND, FOR A DREDGED ) (Rulemaking)MATERIAL PLACEMENT REGULATION ) APPLICABLE TO THE ILLINOIS RIVER! The focusof today’s proposal includes this waterway and the IllinoisRiver.
  • The Agency
recommended adoption of the proposal with some generally non—substantive modifications.
  • ~ The Agency’s response was submitted as one of the
documents within the Agency’s pre—hearing submission package.
  • Among other matters, maintenance involves
dredging of accumulated sediment as necessary to restore...
Allowed
scantmp6
Adobe Portable Document Format (.pdf) - application/pdf
R 92-017 09_23_93 Opinion and Order.pdf
4
1120306
No
Appears In: R 92-017
Preferred Version: R 92-017 09/23/93 Opinion and Order