  • ILLINOIS POLLUTION CONTROL BOARD
February 4, 1993IN THE MATTER OF: )) PETITION OF REYNOLDS METAL ) AS 91-8COMPANY FOR AN ADJUSTED ) (Adjusted Standard)STANDARD FROM 35 ILL.
  • This delay was necessary because the petition
could result in a revision to the State Implementation Plan(SIP).
  • Before a revision to the SIP can be accepted, the USEPA
must first revise the Federal Implementation Plan (FIP).
  • Reynolds has petitioned the USEPA for the revision of the FIP and
is awaiting the decision.
  • The notice stated that USEPA is
proceeding expeditiously with the reconsideration.
  • Given that the USEPA has stayed the effectivene...