View Properties

AS 91-008 12/16/93 Order
IN THE MATTER OF: PETITION OF REYNOLDS METAL COMPANY FOR ADJUSTED STANDARD FROM 35 ILL. ADM. CODE 218.980
Handle: Document-19892
Owner: Site Administrator (User-2, admin:DocuShare)DS
Monday, April 29, 2002 01:51:33 PM CDT
Tuesday, June 25, 2002 10:26:16 AM CDT
Modified By: Site Administrator (User-2, admin:DocuShare)DS
Locked By:
  • ILLINOIS POLLUTION CONTROL BOARD
December 16, 1993IN THE MATTER OF: )) PETITION OF REYNOLDS ) AS 91-8METAL COMPANY FOR ADJUSTED ) (Adjusted Standard)STANDARD FROM 35 ILL.
  • This delay was
necessary because the petition could result in a revision to theState Implementation Plan (SIP).
  • Before a revision to the SIP can
be accepted, the USEPA must first revise the Federal ImplementationPlan (FIP).
  • Reynolds has petitioned the USEPA for the revision of
the FIP and is awaiting the decision.
  • On
September 22, 1993, the USEPA published a Proposed Rule in theFederal Register which proposed revisions to the FIP consistin...
Allowed
scantmp1
Adobe Portable Document Format (.pdf) - application/pdf
03.pdf
4
306545
No
Appears In: AS 91-008
Preferred Version: AS 91-008 12/16/93 Order