ILLINOIS POLLUTION CONTROL BOARD
December 16,
 1993
IN THE MATTER OF:
 )
)
PETITION OF REYNOLDS
 )
 AS 91-8
METAL
COMPANY FOR ADJUSTED
 )
 (Adjusted Standard)
STANDARD FROM 35 ILL.
 ADM.
 )
CODE 218.980
 )
ORDER OF THE BOARD
 (by C.A. Manning):
This matter is before the Board pursuant to a status report
filed by Reynolds Metal Company (Reynolds)
 on December 13,
 1993.
Reynolds
 filed
 a
 September
 4,
 1991
 Petition
 for
 an
 Adjusted
Standard and the Board accepted this matter for hearing on January
23, 1992,
 but delayed assigning a hearing officer.
 This delay was
necessary because the petition could result in a revision to the
State Implementation Plan (SIP).
 Before a revision to the SIP can
be accepted, the USEPA must first revise the Federal Implementation
Plan (FIP).
 Reynolds has petitioned the USEPA for the revision of
the FIP and is awaiting the decision.
On June 23, 1992, the USEPA published a notice in the Federal
Register staying the effectiveness of 40 CFR 52.741(x) and
 (y)
 as
they
 apply
 to
 Reynolds,
 to
 allow
 the
 USEPA
 to
 reconsider
 the
applicability of these rules to Reynolds. The notice stated that
USEPA
 is
 proceeding
 expeditiously
 with
 reconsideration.
 On
September
 22,
 1993,
 the USEPA published a Proposed Rule
 in the
Federal Register which proposed revisions to the FIP consisting of
site specific control requirements~for Reynolds’ aluminum rolling
operations.
 Comments were accepted until October
 22,
 1993, and
according to the December 13, 1993 status report, Reynolds was the
only
 commenter
 on
 the
 proposed
 rule,
 requesting
 a
 minor
clarification in the language.
Based
 on the USEPA’s
 stay
 of the effectiveness
 of
 40 CFR
52.741(x)
 and
 (y),
 on
 February
 4,
 1993
 the
 Board
 stayed
 the
proceedings in this matter until May 4,
 1993,
 and has on several
occasions,
 extended the stay.
 We hereby extend the stay in this
case until Thursday, March 3, 1994.
 Reynolds is directed to file
an updated status report on or before Thursday, February 24,
 1993,
indicating
 whether
 the
 rule
 is
 finally
 promulgated
 by
 USEPA,
whether this adjusted standard docket continues to be necessary and
whether an additional status report
 is required.
 Reynolds should
also request an extension of the stay if one is required.
IT IS SO ORDERED.
2
I,
 Dorothy M. Gunn,
 Clerk of the Illinois Pollution Control
Board,
 hereby
 certify t~atthe above
 order was
 adopted on the
/~2Z~
 day
 of
 ___________________,
 1993,
 by
 a
 vote
 of
Dorothy M. ~nn,
 Clerk
Illinois Po3/Lution Control Board