Springfield wishes to build temporary dams on the Sangamon
River during extreme drought conditions.
at 8, 9).
The Board will construe this petition
as a petition for extension of variance.
(Pet. at 2).
PRELIMINARY MATTERSIn PCB 88-113, the variance approved by the Board laid thegroundwork for Springfield to gain Army Corps approval for theconstruction of temporary dams as an emergency measure during“extreme drought conditions.” During the pendency of thevariance, circumstanc...
Allowed
scantmp1
Adobe Portable Document Format (.pdf) - application/pdf