View Properties

R 92-017 02/03/94 Opinion and Order
IN THE MATTER OF PETITION OF THE U.S. ARMY ENGINEER DISTRICT, ROCK ISLAND, FOR A DREDGED MATERIAL PLACEMENT REGULATION APPLICABLE TO THE ILLINOIS RIVER / WATERWAY BETWEEN LA GRANGE LOCK AND DAM (MILE 80.2) AND LOCKPORT LOCK (MILE 291): 35 ILL. ADM. CODE 303.400
Handle: Document-18677
Owner: Site Administrator (User-2, admin:DocuShare)DS
Tuesday, April 23, 2002 01:36:13 PM CDT
Thursday, October 14, 2004 03:51:10 PM CDT
Modified By:
Locked By:
  • ILLINOIS POLLUTION CONTROL BOARD
February 3, 1994IN THE MATTER OF: )) PETITION OF THE U.S.
  • ARMY ENGINEER ) R92-17
DISTRICT, ROCK ISLAND, FOR A DREDGED (Rulemaking)MATERIAL PLACEMENT REGULATION ) APPLICABLE TO THE ILLINOIS RIVER! 1 The “Illinois Waterway” is defined statutorily in theIllinois Waterway Act at 615 ILCS 10/1 as a waterway fromLockport to a point on the Illinois River near Utica.
  • The Agency
recommended adoption of the proposal with some generally nonsubstantive modifications.
  • By order of July 26,
1993 the hearing officer set the post-hearing comment perio...
Allowed
Administrator
Adobe Portable Document Format (.pdf) - application/pdf
R 92-017 02_03_94 Opinion and Order.pdf
4
1105508
No
Appears In: R 92-017
Preferred Version: R 92-017 02/03/94 Opinion and Order