2 and the Vacuum Pipe Still are completed, whichever
comes first.
2 and the Vacuum Pipe Still are completed, whichever comes first.
Adm.
Code 201.141,
201.149, 214.100 and 214.162 for the period beginning April 10,1995 and continue for forty-five (45)-days or until the requiredrepairs to the Fluid Catalytic Cracking Unit, Alkylati...
Allowed
Administrator