by combining limestone, clay, sand and slag in predetermined proportions, which materials are then crushed and pulverizedin grinding mills to produce lciln feed” (R-8).
Approximately
1900 tons of raw material are processed daily.
The total volume of gases is about 120,000 SCFZ3.
A detailed review
of the events leading up to the present petition is necessary.
2, coupled with
the installation of a wet scrubber ahead of the ESP.
Allowed
scantmp5
Adobe Portable Document Format (.pdf) - application/pdf