  • 209
1 BEFORE THE POLLUTION CONTROL BOARDOF THE STATE OF ILLINOIS23 IN THE MATTER OF: ) 4 ) NATURAL GAS-FIRED, PEAK-LOAD ) R01-105 ELECTRICAL POWER GENERATING ) FACILITIES (PEAKER PLANTS).
  • )
67 VOLUME II89 The following is a transcript of proceedings10 from the hearing held in the above-entitled11 matter, taken stenographically by GEANNA M.
  • 12 IAQUINTA, CSR, a notary public within and for the
13 County of Cook and State of Illinois, before14 MS.
  • I
2 want to welcome all of you.
  • Thank you for coming
3 to this second in a number of inquiry hearings4 that the Board is hol...