R 01-010 09/14/00 Hearing Transcript
In the matter of: Natural Gas-Fired, Peak-Load Electrical Power Generating Facilities (Peaker Plants)
Handle: Document-12986
Owner: Site Administrator (User-2, admin:DocuShare)DS
Thursday, April 26, 2001 01:14:05 PM CDT
Tuesday, December 4, 2001 03:34:42 PM CST
Modified By: Site Administrator (User-2, admin:DocuShare)DS
Locked By:
  • 575
1 BEFORE THE ILLINOIS POLLUTION CONTROL BOARDOF THE STATE OF ILLINOIS23 IN THE MATTER OF: )) 4 NATURAL GAS-FIRED, PEAK-LOAD ) R01-10ELECTRIC POWER GENERATING ) 5 FACILITIES (PEAKER PLANTS.) ) 67 VOLUME IV8910 The following is a transcript of11 proceedings from the hearing in the above-entitled12 matter, taken stenographically by TERRY A.
  • STRONER,
13 CSR before AMY JACKSON, Hearing Officer at 121514 Houbolt in Joliet, Illinois on the 14th day of15 September, A.D., 2000, scheduled to commence at 3:0016 o'clock p.m., commencing at 3:10 o'clock p.m.
  • 17
18192021222324 L.A.
  • REPORTING (312)...