| Illinois Environmental Protection Agency |
| In the matter of: Natural Gas-Fired, Peak-Load Electrical Power Generating Facilities (Peaker Plants) |
| Exhibit 1 |
| |
Handle:
|
Document-12336
|
Owner:
|
Site Administrator (User-2, admin:DocuShare)DS
|
| Thursday, April 19, 2001 04:32:45 PM CDT |
| Tuesday, December 4, 2001 02:48:20 PM CST |
Modified By:
|
Site Administrator (User-2, admin:DocuShare)DS
|
| |
Locked By:
|
|
| - Table: List of Existing and New Simple Cycle, and New Combined Cycle Units
Combined Cycle Units are Highlighted F:utility\peakersEGU\sheet 2\10-31-2000\v gupta S.- ID # Company Name Street Address Location County EGU Site Ozone Permit Date Date Oper.
- Proposal Subpart W Control Turbine mmBtu/hr mmBtu/hr Fuel Used lb per hour tpy per hr @Site/yr mmGal./Yr.
- avg.
- C.F.>10% fuel usage, water/fuel ratio, fuel usage,Btu, water usage, oper.
- Hrs Major Under Review
9 041806AAC Ener Star- Montana Stn Rural Newman Douglas New Yes 00060075 C 6/22/2000 Review Pending SCT 2 GE 7FA Frame No DLN 161 1640 N.Gas Peaking 9 0.036 NSPS Under Review 10 041806AAC Ener Star- Montana Stn R... |
| Allowed |
| |
|
Microsoft Excel Spreadsheet (.xls, .xlw, .xlt, .xla) - application/vnd.ms-excel
|
| BOA.xls |
| |
| 4 |
| 71168 |
| |
| |
| No |
Appears In:
|
R 01-010
|
Preferred Version:
|
Illinois Environmental Protection Agency
|