View Properties

S96009D.PDF
Handle: Document-11406
Owner: Site Administrator (User-2, admin:DocuShare)DS
Monday, April 16, 2001 06:12:46 PM CDT
Monday, April 16, 2001 06:12:46 PM CDT
Modified By:
Locked By:
  • ILLINOIS POLLUTION CONTROL BOARD
August 15, 1996IN MATTER OF:PETITION OF COMMONWEALTHEDISON COMPANY FOR AN ADJUSTEDSTANDARD FROM 35 ILL.
  • at __).
  • 2
Edison waived hearing in this matter pursuant to 35 Ill.
  • Fly ash is shipped off-site for disposal.
  • Edison deposited bottom ash and slag into the West Filled Area prior to 1975.
  • From the Main Quarry the water drains by gravity into
the North Quarry settling pond and finally the sluicing water is pumped back into the River(under NPDES permit #IL0002216). (Pet. at 4.) However, Edison states that as its mandatory application for 3significant modification indicated, Lincoln Quarry cannot satisfy some of these standards.
Allowed
Adobe Portable Document Format (.pdf) - application/pdf
S96009D.PDF
4
70734
No
Appears In: AS 96-009
Preferred Version: S96009D.PDF