Version 1
| Illinois Pollution Control Board Grants Provisional Variance to Dynegy Midwest Generation | |
| September 5, 2002 - On September 5, 2002, the Illinois Pollution Control Board granted a 45-day provisional variance from the daily maximum and monthly average total suspended solids effluent limits in Dynegy Midwest Generation’s (Dynegy) National Pollutant Discharge Elimination System (NPDES) permit for the 45-day period beginning September 2, 2002. The provisional variance will allow Dynegy to dredge the secondary cell of the plant’s ash pond at its coal-fired generating system located near Baldwin in St. Clair and Randolph Counties. | |
| Handle: | Document-86163 |
| Owner: | Site Administrator (User-2, admin:DocuShare)DS |
| Thursday, October 9, 2014 11:18:35 AM CDT | |
| Wednesday, October 15, 2014 07:40:08 AM CDT | |
| Modified By: | Site Administrator (User-2, admin:DocuShare)DS |
| Locked By: | |
| |
| Allowed | |
| Adobe Portable Document Format (.pdf) - application/pdf | |
| Illinois Pollution Control Board Grants Provisional Variance to Dynegy Midwest Generation.pdf | |
| No | |
| 1 | |
| 9643 | |
| No | |
| Appears In: | Calendar Year 2002 |
| Preferred Version: | Illinois Pollution Control Board Grants Provisional Variance to Dynegy Midwest Generation |