View Properties

Illinois Pollution Control Board Grants Provisional Variance to Dynegy Midwest Generation
September 5, 2002 - On September 5, 2002, the Illinois Pollution Control Board granted a 45-day provisional variance from the daily maximum and monthly average total suspended solids effluent limits in Dynegy Midwest Generation’s (Dynegy) National Pollutant Discharge Elimination System (NPDES) permit for the 45-day period beginning September 2, 2002. The provisional variance will allow Dynegy to dredge the secondary cell of the plant’s ash pond at its coal-fired generating system located near Baldwin in St. Clair and Randolph Counties.
Handle: Document-86163
Owner: Site Administrator (User-2, admin:DocuShare)DS
Thursday, October 9, 2014 11:18:35 AM CDT
Wednesday, October 15, 2014 07:40:08 AM CDT
Modified By: Site Administrator (User-2, admin:DocuShare)DS
Locked By:
  • For immediate release CONTACT: Connie Newman
September 5, 2002 217/782-7630Illinois Pollution Control Board Grants Provisional Variance to DynegyMidwest GenerationChicago – On September 5, 2002, the Illinois Pollution Control Boardgranted a 45-day provisional variance from the daily maximum and monthlyaverage total suspended solids effluent limits in Dynegy Midwest Generation’s(Dynegy) National Pollutant Discharge Elimination System (NPDES) permit forthe 45-day period beginning September 2, 2002.
  • Clair and Randolph Counties.
  • On September 4, 2002, the Illinois Environmental Protection Agency
(IEPA) recommended that the Board...
Allowed
Adobe Portable Document Format (.pdf) - application/pdf
Illinois Pollution Control Board Grants Provisional Variance to Dynegy Midwest Generation.pdf
No
1
9643
No
Appears In: Calendar Year 2002
Preferred Version: Illinois Pollution Control Board Grants Provisional Variance to Dynegy Midwest Generation