| - BEFORE THE POLLUTION CONTROL BOARD
OF THE STATE OF ILLINOISMIDWEST PETROLEUM COMPANY, ) ) Petitioner, )) PCB No.) (UST Appeal)ILLINOIS ENVIRONMENTAL ) PROTECTION AGENCY, )) Respondent.- (AR, p.
- 123; TR, p.
- 134, 152) The “clean overburden” is recognized as soil that
is not required to be removed during remediation, whereas contaminated soil isrequired to be removed.- (AR, p. 118, 122; TR, p. 106) Mr. Weller did consult with
Mr. Chappell. (TR, p 8-9) The conditional Agency approval dealt with mattersnot directly related to this appeal. |