Because the postmark date of the joint request is within the time for filing, the joint
request was timely filed.
At issue is the Agency’s
approval of the reimbursement of requested corrective action costs, with modifications, forWinslow Boco’s leaking underground petroleum storage tank facility located at 204 CarverStreet, Winslow, Stephenson County. See 415 ILCS 5/40(a)(1) (2002); 35 Ill. IT IS SO ORDERED.I, Dorothy M. Gunn, Clerk of the Illinois Pollution Control Board, certify that the Boardadopted the above orde...
Allowed
Adobe Portable Document Format (.pdf) - application/pdf