ILLINOIS POLLUTION CONTROL BOARD
    May 15, 2003
     
    WINSLOW BOCO,
     
    Petitioner,
     
    v.
     
    ILLINOIS ENVIRONMENTAL
    PROTECTION AGENCY,
     
    Respondent.
    )
    )
    )
    )
    )
    )
    )
    )
    )
    )
     
     
     
     
     
    PCB 03-213
    (UST Appeal)
    (90-Day Extension)
     
    ORDER OF THE BOARD (by T.E. Johnson):
     
    On May 7, 2003, the parties timely filed a joint notice to extend the 35-day period within
    which Winslow Boco may appeal a March 28, 2003 determination of the Illinois Environmental
    Protection Agency (Agency).
    See
    415 ILCS 5/40(a)(1) (2002); 35 Ill. Adm. Code 105.402,
    105.406. Because the postmark date of the joint request is within the time for filing, the joint
    request was timely filed. 35 Ill. Adm. Code 101.300(b)(2), 105.404. At issue is the Agency’s
    approval of the reimbursement of requested corrective action costs, with modifications, for
    Winslow Boco’s leaking underground petroleum storage tank facility located at 204 Carver
    Street, Winslow, Stephenson County. The Board extends the appeal period until August 1, 2003,
    as the parties request.
    See
    415 ILCS 5/40(a)(1) (2002); 35 Ill. Adm. Code 105.406. If Winslow
    Boco fails to file an appeal on or before that date, the Board will dismiss this case and close the
    docket.
     
    IT IS SO ORDERED.
     
    I, Dorothy M. Gunn, Clerk of the Illinois Pollution Control Board, certify that the Board
    adopted the above order on May 15, 2003, by a vote of 7-0.
     
    Dorothy M. Gunn, Clerk
    Illinois Pollution Control Board
     