Sludge retained in an aerated holding tank is processed by vacuum
filtration and then hauled to a landfill.
of tie new facility.
T:fld~r the oroyosed exoans ion
of toe , c ~ore~eti~r ~ ~eu1d hecome ~n ine~gra1part oc toe oo::~ euilbeng exeanslee. The absence of an interim water quality management plan for the WabashRiver Basin precludes the City’s eligibility at the present time forFederal or State construction grants. —2--6— 652 2. Bond in the amount of $70,000 guaranteeing constructionof the chlori...
Allowed
Adobe Portable Document Format (.pdf) - application/pdf