View Properties

PCB 72-303 01/30/73 Opinion and Order
CITY OF TUSCOLA v. ENVIRONMENTAL PROTECTION AGENCY
Handle: Document-37961
Owner: Site Administrator (User-2, admin:DocuShare)DS
Thursday, March 27, 2003 03:44:09 PM CST
Friday, May 2, 2003 03:30:43 PM CDT
Modified By: Site Administrator (User-2, admin:DocuShare)DS
Locked By:
  • ILLINOIS POLLUTION CONTROL BOARD
January 30, 1973CITY OF TUSCOLA ~72—303V.
  • ENVIRONMENTAL PROTECTION AGENCY
THOMAS A.
  • CENGEL, ASST.
  • Sludge retained in an aerated holding tank is processed by vacuum
filtration and then hauled to a landfill.
  • of tie new facility.
  • T:fld~r the oroyosed exoans ion
of toe , c ~ore~eti~r ~ ~eu1d hecome ~n ine~gra1part oc toe oo::~ euilbeng exeanslee. The absence of an interim water quality management plan for the WabashRiver Basin precludes the City’s eligibility at the present time forFederal or State construction grants. —2--6— 652 2. Bond in the amount of $70,000 guaranteeing constructionof the chlori...
Allowed
Adobe Portable Document Format (.pdf) - application/pdf
OCR0001.pdf
4
542993
No
Appears In: PCB 72-303
Preferred Version: PCB 72-303 01/30/73 Opinion and Order