View Properties

PCB 72-081 11/08/72 Opinion and Order
ENVIRONMENTAL PROTECTION AGENCY v. TEE-PAK INC.
Handle: Document-37760
Owner: Site Administrator (User-2, admin:DocuShare)DS
Tuesday, March 25, 2003 02:22:38 PM CST
Friday, May 2, 2003 11:04:34 AM CDT
Modified By: Site Administrator (User-2, admin:DocuShare)DS
Locked By:
  • ILLINOIS POLLUTION CONTROL BOARD
November 8, 1972ENVIRONMENTAL PROTECTION AGENCY,Complainant,vs.
  • During the manufacturing process
hydrogen sulfide gas (H2S) is released.
  • The first cor~.rolequipment,
however, was not installed until 1969.
  • The parties now propose that we authorize a period of about
ten months for the purpose of monitoring and adjusting theemission control eouiprnent which has already been installed andmaking various tests to determine if this added scrubbingcapacity solves the nuisance problem.
  • The parties do not, of course, guarantee that the untested
scrubbers will solve the nuisance problem.
Allowed
Adobe Portable Document Format (.pdf) - application/pdf
OCR0001.pdf
4
1177818
No
Appears In: PCB 72-081
Preferred Version: PCB 72-081 11/08/72 Opinion and Order