  • ILLINOIS POLLUTION CONTROL BOARD
September 13, 1973HOWARD AND NARY JO PERREAULT ADAMS,Petitioners,vs.
  • Normal usage of the plumbing by this family of four
would require emptying of the tank every 2 or 3 days.
  • A variance is now recuested to allow a sewer line connection
to the Lake Forest sewer system.
  • Obviously, when full, it must be emptied in
order to allow continued usage.
  • As we did in Bereskin and Solomon vs.
  • EPA, FCB 73-143, we
will allow a conditional variance in order that Petitioner mayproceed with construction work up to the sewer line short ofactual connection.
Allowed