  • ILLINOIS POLLUTION CONTROL BOARD
December 19, 1974A.?.
  • GREEN REFRACTORIES CO.
  • Mining is carried
out by the use of dozers, drag crane, and scraping equipment.
  • Other materials from the grinding operation are diverted
to the “Hendryx” Building, which is essentially a material handlingfacility.
  • Crush.
  • Dept.
Dryer SO2 4960 ppm 204(f) (1) (A) 2000 ppmAn initial hearing was held, on August 13, 1974, at which time a tentative stipulation was entered into between the parties. 3. The present drying operation in the grinding department will be discontinued.
Allowed