PCB 75-175 02/11/76 Opinion and Order
CPC INTERNATIONAL, INC. v. ENVIRONMENTAL PROTECTION AGENCY, Respondent, AND S.O.R.E. Intervenor
Handle: Document-34354
Owner: Site Administrator (User-2, admin:DocuShare)DS
Friday, January 31, 2003 12:07:39 PM CST
Friday, April 25, 2003 03:42:05 PM CDT
Modified By: Site Administrator (User-2, admin:DocuShare)DS
Locked By:
  • ILLINOIS POLLUTION CONTROL BOARD
February 11, 1976CPC INTERNATIONAL, INC.,Petitioner,v.
  • ) PCB 75—175
ENVIRONMENTAL PROTECTIONAGENCY, Respondent.
  • Dan Galatzer appeared on~behalf of Intervenor.
  • OPINION AND ORDER OF THE BOARD (by Mr.
  • Petitioner’s process steam
and electricity are supplied by five boilers, two of which are225 MMBTU/hr gas-fired and the others being 332.5 MMBTU/hr pulverized, dry bottom, coal-fired boilers.
  • Emissions were to be controlled by bag-houses. Petitioner was unable
to obtain a steady source of pelletized solid waste fuel to operateon a regular basis. ORDERIt is the Order of the Board that CPC’s petition for variancefrom Rules 203(g)...
Allowed