View Properties

PCB 76-110 07/08/76 Opinion and Order
CITY OF LINCOLN v. ENVIRONMENTAL PROTECTION AGENCY
Handle: Document-33634
Owner: Site Administrator (User-2, admin:DocuShare)DS
Thursday, January 23, 2003 09:50:09 AM CST
Wednesday, May 28, 2003 10:50:50 AM CDT
Modified By: Site Administrator (User-2, admin:DocuShare)DS
Locked By:
  • ILLINOIS POLLUTION CONTROL BOARD
July 8, 1976CITY OF LINCOLN, ) Petitioner,v.
  • ) PCB 76—110
ENVIRONMENTAL PROTECTION AGENCY, ) Respondent.
  • The treatment plant has a design capacity of 2.5 MGD with
an average dry weather flow of 2.25 MGD.
  • facilities, including combined sewer overflows, will
not be awarded until an evaluation of the facilities plan is complete,probably by December of 1976.
  • In view of the foregoing, the Board is disposed to grant the
City of Lincoln the relief requested.
  • The City
will be required to submit its completed facilities plan byDecember 1, 1976.
Allowed
Adobe Portable Document Format (.pdf) - application/pdf
OCR0004.pdf
4
554496
No
Appears In: PCB 76-110
Preferred Version: PCB 76-110 07/08/76 Opinion and Order