February 2, 1978ILLINOIS POWER COMPANY,(Baldwin Station) Petitioner,v.
) PCB75-~9
ENVIRONMENTAL PROTECTION ) AGENCY, Respondent.
Coal analysis indicates
a heat content of 10,477 btu/lb.
29 — 117
Baldwin is prosei~ iri~tallirgan intermi ~~it controlsystem (ICS) consistii ~l:ven monitors inS~~iLj~ed a ringaround the ~:lant to moni~:: sL~1ur dioxide emi~i’n:~,and a 100foot meteorological tower c~ct:ec1at the plant.
Baldwin requests a temporary emission level roughly 25
above the current limitation of 204(e), and should be in a positionto predict and head-off any excursions above amb...