View Properties

PCB 75-109 02/02/78 Opinion and Order
ILLINOIS POWER COMPANY, (Baldwin Station) v. ENVIRONMENTAL PROTECTION AGENCY
Handle: Document-32602
Owner: Site Administrator (User-2, admin:DocuShare)DS
Thursday, January 9, 2003 09:51:41 AM CST
Friday, May 16, 2003 11:06:46 AM CDT
Modified By: Site Administrator (User-2, admin:DocuShare)DS
Locked By:
  • w~LINOlSPOLLUTION CONTROL BOAF~
February 2, 1978ILLINOIS POWER COMPANY,(Baldwin Station) Petitioner,v.
  • ) PCB75-~9
ENVIRONMENTAL PROTECTION ) AGENCY, Respondent.
  • Coal analysis indicates
a heat content of 10,477 btu/lb.
  • 29 — 117
Baldwin is prosei~ iri~tallirgan intermi ~~it controlsystem (ICS) consistii ~l:ven monitors inS~~iLj~ed a ringaround the ~:lant to moni~:: sL~1ur dioxide emi~i’n:~,and a 100foot meteorological tower c~ct:ec1at the plant.
  • Baldwin requests a temporary emission level roughly 25
above the current limitation of 204(e), and should be in a positionto predict and head-off any excursions above amb...
Allowed
Adobe Portable Document Format (.pdf) - application/pdf
OCR0001.pdf
4
680740
No
Appears In: PCB 75-109
Preferred Version: PCB 75-109 02/02/78 Opinion and Order