April 16, 1981THE VILLAGE OF SAUGETAND THE CITY OF EAST ST.
In September, 1977, the Village of Sauget was designated
as lead agency for the design, construction and operationof a Regional Wastewater Treatment Facility to provide primaryand secondary treatment of the wastewater from the Cities ofEast St.
Louis’ First Flush Analysis for the American Bottoms Regional
Treatment Wastewater Facility” conducted by Russell and Axon,Inc., and submitted with the petition).
The Russell study concluded that the most cost—effective
means of treating first flush flows would be to construct a 21million gallon equalization basin to store the first flushand...
Allowed