View Properties

PCB 83-232 Dumelle Concurring Opinion 12/15/83
CITY OF WOOD RIVER v. ILLINOIS ENVIRONMENTAL PROTECTION AGENCY
Handle: Document-29376
Owner: Site Administrator (User-2, admin:DocuShare)DS
Tuesday, November 19, 2002 12:09:32 PM CST
Tuesday, November 19, 2002 12:10:22 PM CST
Modified By: Site Administrator (User-2, admin:DocuShare)DS
Locked By:
  • ILl XNOIS POLLtJTtON CONTROL BOARI)
December 1.5, 1983(2tTY OF WOOD RIVE~R,Petitioner, PCJ3 83—232tLLINOIS ENVIRONMENTALPROTI~’CT(ON AGFNCY,Respondent.
  • Since the wet well and interceptor sewer have a one hour
~ioldingcapacity, the system could have been pumped down,d.sconnected for up to an hour from the portable power supplywhile the new hookup occurred and then restarted with no bypassing at all tD the Mississippi River.
  • But an examination of the portable
power supply alternative might have made that effect non-existent.
  • Dumelle
ChairmanI, Christan L.
  • Moffett, Clerk of the Illinois Pollution
Control Board, do hereby cer~if~ythat the above ConcurringOpini...
Allowed
Adobe Portable Document Format (.pdf) - application/pdf
OCR0005.pdf
4
143970
No
Appears In: PCB 83-232
Preferred Version: PCB 83-232 Dumelle Concurring Opinion 12/15/83