At hearing no information was presented in addition to
that already contained in the documents submitted to date.
The permit was issued by the Agency on
April 9, 1987.
99—266
—3—DESIGN DEFICIENCES AND COMPLIANCE PLANANC acquired Guardian in late 1987 and discovered severaldesign deficiencies in the control system. ANC adds that the contractor who installed theincinerator has agreed to modify the incinerator system toinstall a heat exchanger bypass whereby a port...