View Properties

PCB 92-090 10/21/93 Opinion and Order
THE ROBERTSON-CECO CORPORATION v. ILLINOIS ENVIRONMENTAL PROTECTION AGENCY
Handle: Document-19419
Owner: Site Administrator (User-2, admin:DocuShare)DS
Friday, April 26, 2002 09:31:42 AM CDT
Monday, October 18, 2004 01:26:39 PM CDT
Modified By: Site Administrator (User-2, admin:DocuShare)DS
Locked By:
  • ILLINOIS POLLUTION CONTROL BOARD
October 21, 1993THE ROBERTSON-CECO CORPORATION, ) Petitioner,v.
  • ) PCB 92—90
(Variance)ILLINOIS ENVIRONMENTALPROTECTION AGENCY,Respondent.
  • Therefore, the following is a comprehensive discussion of the
factors which were also relevant at that time.
  • The air pollution control
equipment consisted of a baghouse collector system which removedentrained dust from the furnace exhaust.
  • Based on records and information
available, NUS estimated that fifteen percent of the dust storedat the site remained in 1983.
  • Ceco responded to those comments on April
30, 1985.
Allowed
Administrator
Adobe Portable Document Format (.pdf) - application/pdf
PCB 92-090 10_21_93 Opinion and Order.pdf
4
1040776
No
Appears In: PCB 92-090
Preferred Version: PCB 92-090 10/21/93 Opinion and Order