View Properties

PCB 15-169 Order 031915
Handle: Document-88441
Owner: Brown, Don (User-14, brownd:DocuShare)DS
Friday, March 20, 2015 09:41:01 AM CDT
Friday, March 20, 2015 09:41:41 AM CDT
Modified By:
Locked By:
  • ILLINOIS POLLUTION CONTROL BOARD
March 19, 2015NORM CREVELING,Petitioner,v.
  • ILLINOIS ENVIRONMENTAL
PROTECTION AGENCY,Respondent.
  • Adm.
  • Code 101.300(b), 105.206(c), 105.208(a), (c).
  • In the determination, the Agency approved
the Corrective Action Plan, however determined that the use of a project labor agreement (PLA)is required for petitioner’s facility located at 302 S.
  • Railroad Ave., Buckley, Iroquois County. See 415
ILCS 5/40(a)(1) (2012); 35 Ill. IT IS SO ORDERED.Board Member G.M. Keenan voted present.
Allowed
Adobe Portable Document Format (.pdf) - application/pdf
PCB 15-169 Order 031915.pdf
No
1
17878
No
Appears In: PCB 2015-169
Preferred Version: PCB 15-169 Order 031915