Sent: Friday, June 15,201210:25 AMTo: BWenzel@mp-mail.comCc: Walsh Ill, Edward V.; dsusler@nmlp.com; O'Meara, RobertS.; jdubrock@nmlp.com; Bernoteit, BobSubject: RE: NACME (J.D.
No.
031600FWL) Comments to Draft FESOP
Britt,Your main argument against NSPS Subpart TT applicability is the absence of curing and quenching stations in theNACME finish coat protective oil application operations.
In 1988 the US EPA Region 5 made Applicability
Determination on the performance testing for coil coating line which does not have a cur...
Allowed
Adobe Portable Document Format (.pdf) - application/pdf