January 22, 2015DYNEGY MIDWEST GENERATION, LLC,BALDWIN ENERGY COMPLEX,Petitioner,v.
ILLINOIS ENVIRONMENTAL
PROTECTION AGENCY,Respondent.
See 415 ILCS 5/4, 5, 40(a)(1) (2012); 35 Ill.
See 35 Ill.
Adm.
Code 105.214(a). Accordingly, though the Board hearing affords a permit applicant the
opportunity to challenge the Agency’s reasons for denying or conditionally granting the permit,information developed after the Agency’s decision typically is not admitted at hearing orconsidered by the Board. 2002). 2Hearings will be scheduled and completed in a timely manner, consistent with thedecision deadline (see 415 ILCS 5/40(a)(2) (2012)), which...