View Properties

R14-10,102014 PC# 3034, IDNR PstHrngCmts Aprnc RGM
Handle: Document-86612
Owner: Brown, Don (User-14, brownd:DocuShare)DS
Tuesday, October 21, 2014 10:15:57 AM CDT
Tuesday, October 21, 2014 10:21:44 AM CDT
Modified By:
Locked By:
  • BEFORE THE ILLINOIS POLLUTION CONTROL BOARD
IN THE MATTER OF:COAL COMBUSTION WASTE (CCW)SURFACE IMPOUNDMENTS AT POWERGENERATING FACILITIES: PROPOSEDNEW 35 ILL.
  • Part 3702 addresses all technical aspects of dam safety
design, construction, operation, maintenance and removal.
  • The effect of this change will
raise the regulatory classifications of the CCR impoundments, thereby requiring the owners of allCCR impoundments to obtain an operating permit for their impoundments.
  • Dam
safety pennits will be in effect after the proposed closure under the IEPA Proposed Rule.
  • The IDNR inspections covered 81 impoundments (99 if
sub-impoundments are counted individually).
  • Based upon the ...
Allowed
Adobe Portable Document Format (.pdf) - application/pdf
R14-10,102014 PC# 3034, IDNR PstHrngCmts Aprnc RGM.pdf
No
1
917598
No
Appears In: R2014-010
Preferred Version: R14-10,102014 PC# 3034, IDNR PstHrngCmts Aprnc RGM