View Properties

Board Will Hold Additional Hearings to Further Consider Groundwater Monitoring for Clean Construction or Demolition Debris Fill Operations
March 21, 2013 - On March 21, 2013, the Illinois Pollution Control Board, adopted an order directing additional hearings concerning groundwater monitoring for Clean Construction or Demolition Debris (CCDD) and Uncontaminated Soil Fill Operations be held. On August 23, 2013, the Board adopted amendments to the Board’s rules allowing the use of CCDD and uncontaminated soil to be used as fill at quarries, mines and other excavations. Additionally, the Board opened a Subdocket B, at the recommendation of the Joint Committee on Administrative Rules (JCAR), to examine the issue of groundwater monitoring at CCDD or uncontaminated soil fill operations. The proposal is docketed as Proposed Amendments To Clean Construction Or Demolition Debris Fill Operations (CCDD): Proposed Amendments To 35 Ill. Adm. Code 1100, R12-9(B).
Handle: Document-86527
Owner: Site Administrator (User-2, admin:DocuShare)DS
Thursday, October 16, 2014 02:40:58 PM CDT
Thursday, October 16, 2014 02:41:27 PM CDT
Modified By: Site Administrator (User-2, admin:DocuShare)DS
Locked By:
  • Board Will Hold Additional Hearings to Further Consider Groundwater Monitoring for
Clean Construction or Demolition Debris Fill OperationsOn March 21, 2013, the Illinois Pollution Control Board, adopted an order directing additionalhearings concerning groundwater monitoring for Clean Construction or Demolition Debris(CCDD) and Uncontaminated Soil Fill Operations be held.
  • Adm.
  • Code 1100, R12-9(B).
  • On September 21, 2012, a hearing officer order sought comment from any interested person on
whether the Board should require groundwater monitoring at CCDD and uncontaminated soil fillfacilities.
  • The Board
directs the hearing officer to schedule hearings and provide participants wi...
Allowed
Adobe Portable Document Format (.pdf) - application/pdf
CCDDFO 12-9 130321.pdf
No
1
16017
No
Appears In: Calendar Year 2013
Preferred Version: Board Will Hold Additional Hearings to Further Consider Groundwater Monitoring for Clean Construction or Demolition Debris Fill Operations