made and agreed upon for purposes of settlement only and as a factual basis for the Board'sapproval of this Stipulation and issuance of relief.
5.
The site includes a repair shop ("repair shop") which services and maintains the
semHrucks.
9. On December 30, 2010, the Illinois EPA conducte~ an inspection of the site. 12. On February 14, 2010, Donley allowed lllini Septic & Sewer, 1012 Lenhart Road,
Springfield, IL to collect the oil/water separator waste which had accumulated in the oil/wat...
Allowed
Adobe Portable Document Format (.pdf) - application/pdf