("Caterpillar"), by and through its attorneys, Baker &
McKenzie LLP, and hereby moves the Illinois Pollution Control Board (the "Board") for anextension of the time period for compliance with paragraph 5 of the Board's Order in the abovecaptioned matted, dated November 7, 2013 (the "Order"), until June 4, 2014.
A copy ofthe filed ELUC is attached hereto as Exhibit A.
5.
Caterpillar would like to ensure that the filed ELUC satisfies the Board's
requirements for an adjusted standard at the Mapleton landfill.
NOW, THEREFOR...
Allowed
Adobe Portable Document Format (.pdf) - application/pdf