this order, the Board describes the legal framework for tax certifications, discusses the Agency’srecommendation, and certifies that Dynegy’s flue gas desulfurization system, particulate matter(PM) collection device, and sorbent injection system for Unit Number 3, Boiler Number 3, atBaldwin Station are pollution control facilities.
See 35 Ill.
Adm.
Code 125.204(a)(4).
If the Board finds “that the claimed
facility or relevant portion thereof is a pollution control facility .. ., the Pollution Control Board 2 ... shall enter a finding and issue a certif...
Allowed
Adobe Portable Document Format (.pdf) - application/pdf