View Properties

R13-19,040913 AER TSD Pg 1-227
Handle: Document-79731
Owner: Brown, Don (User-14, brownd:DocuShare)DS
Wednesday, April 10, 2013 10:28:07 AM CDT
Wednesday, April 10, 2013 10:28:44 AM CDT
Modified By:
Locked By:
  • SITE-SPECIFIC RULE FOR THE CLOSURE OF AMEREN
COMPANY ASH PONDS: PROPOSED NEW 35 ILL.
  • The proposed
rule requires AER to perform an initial assessment to categorize the ash ponds for a phasedclosure.
  • When fully implemented, the proposed cap and
closure scenario will improve groundwater quality around surface impoundments showingimpacts to groundwater.
  • • Hydrogeological Assessment Reports – These reports analyze the available groundwater
monitoring data and describe existing physical conditions, including the character of thearea involved, at the Coffeen, Duck Creek, Edwards, Grand Tower, and MeredosiaPower Stations.
  • Mr.
  • Harley also discusses the estimated costs of closure...
Allowed
Adobe Portable Document Format (.pdf) - application/pdf
R13-19,040913 AER TSD Pg 1-227.pdf
No
1
6200264
No
Appears In: R2013-019
Preferred Version: R13-19,040913 AER TSD Pg 1-227.pdf