November 15, 2012PRAIRIE RIVERS NETWORK and SIERRACLUB,Petitioners,v.
ILLINOIS ENVIRONMENTAL
PROTECTION AGENCY and PEABODYGATEWAY NORTH MINING, LLC,Respondents.
Adm.
Code 302.105(c)(2)(B), which compels the Agency to assure that “all technically and
economically reasonable measures to avoid or minimize the extent of the proposed increase inpollutant loading have been incorporated into the proposed activity.” For the reasons below, theBoard accepts petitioners’ petition for hearing.
Petitioners’ petition also states that they are so situated as to be affected by the permitted
facility and includes a copy of the issued permit.
See 415 I...
Allowed
Adobe Portable Document Format (.pdf) - application/pdf