Electronic Filing - Received, Clerk's Office, 08/15/2012 URS Air Quality Control TechnologySelection for E.
  • D.
  • Edwards Station
Final Report - DraftRevision: BDate: 2S May 2011Table ES-4: Capital and Operating Cost Summary -Including Unit 1ControlSystems Capital Requlrement1,4(Units 1-3) $1,000 $IkWLSFO- $377,180 $530relined5LSFO - new5 $412,600 $580Advatech6 N/A N/ALSD+FF $410,460 $580CFB+FF $399,440 $560DSI+FF $280,440 $400SCR(U1) $45,660 $390Mobotec (U2) $11,260 $401 '" Cost based on design coal.
  • $/kW based on 707 net~.
  • 2 " C...