BEFOll! This Brief will attempt to summarize the record and evidenceto support Alton's position.
There are five boilers at the Alton Mill, 1:'ut only two -
Boilers No.6 and 7 - are the subject of this permit appeal • Boilers No.6 and 7 are pulverized coal burning, wet bottomboilers, which vent their e..,i.sion through separate 192 footstacks.
6 and 7.
The
prior permit was to expire on March 29, 1979.
Adm. Co...
Allowed
Adobe Portable Document Format (.pdf) - application/pdf
PCB 85-145,030786 Alton Post Hearing Brief, 3.7. 86.pdf