IN THE MATTER OF: )) PROPOSED AMENDMENTS TO CLEAN ) R12-009CONSTRUCTION OR DEMOLITION ) (Rulemaking – Land)DEBRIS (CCDD) FILL OPERATIONS: ) PROPOSED AMENDMENTS TO 35 Ill.
How will complete exhumation be verified? If complete exhumation is not
possible and waste materials remain in place, will the facility be subject to therequirements of 35 IAC 811? Who will verify forexample, if wells are installed at proper locations and depths? Numerous observationshave shown that this rule is not accurate.