| HO 06-63 05-19-11 |
| |
| |
| |
Handle:
|
Document-72374
|
Owner:
|
Brown, Don (User-14, brownd:DocuShare)DS
|
| Monday, May 23, 2011 05:42:36 PM CDT |
| Monday, May 23, 2011 05:43:18 PM CDT |
Modified By:
|
Brown, Don (User-14, brownd:DocuShare)DS
|
| |
Locked By:
|
|
| - ILLINOIS POLLUTION CONTROL BOARD
May 19, 2011DYNEGY MIDWEST GENERATION, INC.- The parties’ attorneys stated that they continue to try and arrange a meeting with
the Illinois Environmental Protection Agency in an attempt to resolve this appeal.- At the status conference, the parties must be prepared to discuss the status of
the above-captioned matter and their readiness for hearing.Chicago, Illinois 60601 Bradley P.Hearing OfficerIllinois Pollution Control Board100 W.- Randolph Street, Suite 11-500
Chicago, Illinois 60601(312) 814-8917 3PCB 2006-063L. Nichole CunninghamOffice of the Attorney General69 W. Washington StreetSuite 1800Chicago,... |
| Allowed |
| |
|
Adobe Portable Document Format (.pdf) - application/pdf
|
| 06-63 Dynegy Midwest Baldwin.pdf |
| No |
| 1 |
| 47264 |
| |
| |
| No |
Appears In:
|
PCB 06-063
|
Preferred Version:
|
06-63 Dynegy Midwest Baldwin.pdf
|