View Properties

R11-18 prefiled MACHIN 05-23-11
Handle: Document-72364
Owner: Brown, Don (User-14, brownd:DocuShare)DS
Monday, May 23, 2011 04:14:02 PM CDT
Monday, May 23, 2011 04:15:40 PM CDT
Modified By: Brown, Don (User-14, brownd:DocuShare)DS
Locked By:
  • May 23, 2011
Clerk’s OfficeIllinois Pollution Control Board100 W.
  • Randolph, Suite 11-500
Chicago, IL 60652Re: R11-18, Triennial.
  • The authors reportedly emphasized in the foreword that the
publication merely served as a survey and evaluation of the existing literature and that it shouldnot be used to establish specific standards for the State of California or the Public HealthService.
  • We would like to add that IEPA has done an excellent job in researching and developing the
proposed new standard and is to be commended for their efforts.
  • In December 2010,
Marathon received a permit modification that allows for a 15-month time period to achievecompliance with the permit-sp...
Allowed
Adobe Portable Document Format (.pdf) - application/pdf
R11-18 prefiled MACHIN 05-23-11.pdf
No
1
268513
No
Appears In: R2011-018
Preferred Version: R11-18 prefiled MACHIN 05-23-11