to C5-27) On June 10, 2010, Veolia filed a response to the review team’s memorandum in which it agreed to be bound by the 26 conditions.
In
addition, the Siting Approval Ordinance adopted the 2 Condition 2.2 in the Siting Approval Ordinance, which states as follows: 2.2.
Prior to submitting the development permit application to the IEPA for the
landfill gas collection and control system for the proposed Facility, the Owner/Operator shall submit draft plans, designs, and an operations and maintenance plan relating thereto to the City of Zion...
Allowed
Adobe Portable Document Format (.pdf) - application/pdf